Jaw construction waste crusher, construction waste crusher, how long does it take to pay back the cost of construction waste crusher

Is it expensive to invest in a jaw-type construction waste crusher?

   Compared with traditional stationary crushers, its price is naturally more expensive, so why is it expensive and is it worth our investment? Next, Zhizao Grand View will take you to learn more about it.

   1. All components of the jaw-type construction waste mobile crusher are vehicle-mounted. The turning radius is relatively small and the maneuverability is very strong. It is equivalent to a moving production line. It is undoubtedly very beneficial for the harsh environment where construction waste often exists. This option is beyond the reach of traditional stationary crushers.

   2. In addition, the construction waste mobile crushing station can be driven directly to the site for production and processing, which greatly reduces the transportation costs required to transport materials away from the site.

   3. This crushing station can be used for multiple purposes, with various configurations and models. It can be used at production sites, not only to crush construction waste, but also to crush various stones. The mobile jaw crushing station aims at the grand vision of intelligent manufacturing.

   4. In order to pass the environmental impact assessment, the equipment is also specially equipped with dust removal and noise reduction devices and multiple protections to "protect" your production!

Jaw construction waste crusher, construction waste crusher, how long does it take to pay back the cost of construction waste crusher

How long does it take for a construction waste mobile jaw crusher to recover its investment?

   Each ton of construction waste can produce more than 0.7 tons of recycled aggregate. The cost of producing 1 ton of recycled aggregate is about 15 yuan (including electricity costs, labor costs, etc.). Depending on the strength of the aggregate, the price is roughly 30 to 80 yuan/ton (calculated as 30). The dealer of recycled aggregates needs to charge the builder 10 to 20 yuan per ton of construction waste (calculated as 10). After processing, we You can calculate the cost of processing 1 ton of construction waste. (Equivalent to the production of 0.7 tons of recycled aggregates) Profit brought by: (0.7 tons * 30 yuan / ton 10 yuan) - 15 yuan / ton * 0.7 tons = 20.5 yuan. (All calculations are based on low values) For example:

   Investment: 1 million yuan for a single construction waste production line

   Working hours: 8 hours/day

   Processing capacity per hour: 150 cubic meters (1 cubic meter ≈ 1.5 tons)

   Daily profit value: 20.5 yuan*(150*1.5 tons/hour*8 hours*0.7)=25830 yuan

   In other words, the daily profit value is about 25,000 yuan. Depending on the machine output and working hours selected by each user, profits may be higher. Find Zhengzhou Global Heavy Industry for the construction waste jaw mobile crushing station, and then remove some labor costs, electricity consumption, fuel consumption, etc. If the production is stable, it can be recovered in less than half a year, and high profits can be obtained within a year.